
Our Process
1. Get In Touch
We will discuss the specifics of your hydrocarbon contaminated load (source of contamination, amount, material type, timing) and agree any soil testing results required before we can accept your load. Minimum requirements would usually include Heavy Metals and PAH test readings.
2. Disposal
We will then meet you on site at our yard in Bromley and create acceptance dockets for each load accepted. You will need to arrive with a weigh docket for each load (no weigh bridge on site).
3. What next?
That’s it for you! After we have processed and remediated the soil we carry out a range of further tests to determine which further facility we will send material to for its final endpoint.
GET IN TOUCH
​ph 027 263 2585
PO Box 19630, Woolston,
Christchurch 8241
​
Opening Hours :
As per client requirements, please contact us first to arrange delivery drop off times.
